Preventive Action 3: ExamplES & COSTS

10 Key Points | Examples | Techniques

Example

 

The Existing Building
Brief description Badly damaged (80%). Vulnerable to normal typhoon.
Foundations
Foundation walls: block cement with ring beam on 5cm concrete slab.
Structure Bearing wall: block cement with cracks caused by settlement
Walls Block cement walls without plaster, width=10cm, h=2.6m.
Works Carpentry: wood in bad condition; Purlins and rafters: bamboo badly damaged
Roof structure Carpentry: wood in bad condition; Purlins and rafters: bamboo badly damaged
Roof covering Sheet iron
Doors & windows Decayed wood
Total area / m² 22,2m²
Total value / Dôngs 6 660 000d
Value Dôngs / m² 300 000 d/m2

 

The Evaluation of weak points (compared with the 10 key principles of cyclone resistant construction) and identification of strengthening works

The Evaluation of weak points
Principle Evaluation Reinforcement
1. Location Flat land No change
2. Shape of construction Rectangular No change
3. Roof angle 30°
No change
4. Roof overhang, veranda Without a veranda
Roof overhang = 20cm and is resistant
Make new veranda with four reinforced concrete (RC) columns and rafters
5. Liaison between :
Foundation - Walls -Roof
No connection between wall and rafters
Unsafe connection between the wall and roof
New RC foundation for columns, reinforced ring beams for block cement walls.
New block cement walls and posts with good connection
6. Triangular bracing No bracing Steel bar diagonal braces
7. Roof covering Sheet iron
Inadequate fixing of roof covering
Rafters and purlins joined with re-bar.
Reinforcing bar on the roof
8. Opposing openings Approximately
Opening the windows in the back wall
9. Doors and windows Nearly destroyed (70%) New doors and windows with locks
10. Trees (as wind breaks) Few trees around the house Plant more trees around the house at a safe distance
Global evaluation Risk of typhoon damage Reinforcement

 

Cost of Works
Item Dongs
Initial value of the building
6 660 000
Works / Participation of the family 910 000
Works / Participation of DW 3 349 200
Initial value of the building 6 660 000
Works 4 259 200
Final value of the building 10 919 200
Final value / m² 491 855
Cost of reinforcement 4 259 200
% reinforcement / works 100%
% reinforcement / final value 39%

 

 

[back]